Lucidchart
Linearity Curve
| Feature | Linearity Curve | |
|---|---|---|
| Pricing | Free / from $7.95/mo | Free / from $7.99/mo |
| Free Plan | ✓ Yes | ✓ Yes |
| Rating | 4.4 / 5 | 4.4 / 5 |
| Best For | business-analysts, it-teams, project-managers, engineers | illustrators, ui-designers, typography-designers, apple-users |
| Founded | 2010 | 2017 |
| Flowcharts | ✓ | ✗ |
| Org Charts | ✓ | ✗ |
| Uml Diagrams | ✓ | ✗ |
| Data Linking | ✓ | ✗ |
| Automation | ✓ | ✗ |
| Visio Compatibility | ✓ | ✗ |
| Collaboration | ✓ | ✗ |
| Presentation Mode | ✓ | ✗ |
| Vector Editing | ✗ | ✓ |
| Auto Trace | ✗ | ✓ |
| Typography | ✗ | ✓ |
| Templates | ✗ | ✓ |
| Gesture Controls | ✗ | ✓ |
| Export Formats | ✗ | ✓ |
✓ Lucidchart Pros
- Extensive template and shape library for every diagram type
- Data linking imports from CSV, Google Sheets, and databases
- Strong Visio import/export compatibility
- Real-time collaboration with commenting
✗ Lucidchart Cons
- Free plan limited to 3 editable documents
- Can feel slow with very large diagrams
- Advanced features locked behind higher tiers
✓ Linearity Curve Pros
- Free with full features
- Excellent Apple device support
- Intuitive pen tool
- Beautiful interface
✗ Linearity Curve Cons
- Apple ecosystem only
- Limited collaboration
- Fewer plugins than Illustrator
The Verdict
Lucidchart is built for business analysts and it teams, with a focus on flowcharts and org-charts. Linearity Curve targets illustrators and ui designers and leads with vector-editing and auto-trace.
Both tools come in at similar price points ($7.95/mo for Lucidchart, $7.99/mo for Linearity Curve), so pricing won't make the decision for you.
Both offer free plans, so you can test each with your real workflow before committing to a subscription.
Feature-wise, Lucidchart offers broader built-in capabilities (8 features vs 6), while Linearity Curve takes a more focused approach — which can mean a simpler, faster onboarding experience.
This is a genuinely close comparison. If you can, sign up for both free trials (where available) and run a one-week test with your actual team tasks before deciding.